亚洲一级电影在线观看,九九精品无码专区免费,亚洲AV无码资源在线观看 ,欧美国产高清

大學英語閱讀理解題及答案

時間:2024-09-22 17:30:59 英語閱讀 我要投稿
  • 相關推薦

大學英語閱讀理解題及答案

  以下是由yjbys小編為大家提供的大學英語的閱讀理解題以及參考答案,歡迎要考六級的同學閱讀學習一下哦!

大學英語閱讀理解題及答案

  第一篇:

  In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular (標準件的) system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.

  There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.

  After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.

  After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.

  In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.

  1. The main difference between panel method and the method discussed in the last paragraph is_______.

  A. the latter uses ready-made internal features

  B. panels are cast in a level position

  C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms

  D. the former is more expensive than the latter

  2. Which of these statements is TRUE of system building?

  A. It employs more men. B. It is difficult and dangerous.

  C. It can save both time and money. D. It means less mechanization.

  3. According to the passage, the principle of system building is that_______.

  A. construction methods are safer

  B. buildings are made from a set of standardized units

  C. similar buildings can be produced

  D. all units are produced on the site

  4. The usual fixed length in the modular system is_______.

  A. twenty centimeters B. ten millimeters

  C. fifty centimeters D. ten centimeters

  5. What lifts the concrete panels onto the building?

  A. Cranes. B. Man-power.

  C. Pulleys. D. Hydraulic jacks.


【大學英語閱讀理解題及答案】相關文章:

高考英語閱讀理解題及答案03-07

英語閱讀理解題及答案初中03-06

小學英語閱讀理解題及答案03-06

英語閱讀理解題加答案03-08

英語閱讀理解題及答案高中03-06

大學四級英語閱讀理解題及答案03-06

初三英語閱讀答案理解題及答案01-17

大學英語閱讀理解題03-07

高二英語閱讀理解題及答案03-09

主站蜘蛛池模板: 亚洲午夜18| 亚洲精品国产嫩草在线观看东京热| 色妞av永久一区二区国产av | 亚洲中文无码精品卡通| 99久久国产露脸精品国产麻豆| 日本中文一区二区三区亚洲 | 东北女人毛多水多牲交视频| 日韩人妻无码系列专区| 免费观看男人免费桶女人视频| 亚洲中文字幕日本在线观看| 中国女人和老外的毛片| 激情五月婷婷| 国产a在视频线精品视频下载| 99热亚洲精品6码| 91视频国产高清| 亚洲午夜未满十八勿入网站| 在线亚洲午夜理论av大片| 大宁县| 亚洲欧美日韩综合在线一| 人妻内射一区二区在线视频 | 狠狠躁夜夜躁无码中文字幕| 激情无码人妻又粗又大| 2018av天堂在线视频精品观看| 亚洲制服丝袜第一页| 性色香蕉av久久久天天网| 色偷偷中文字幕综合久久| 镇原县| 国产精品偷窥熟女精品视频| 亚洲午夜无码av毛片久久| 精品国产亚洲一区二区三区大结局 | 亚洲精品国产av成拍色拍婷婷 | 欧美成人精品手机在线| 狠狠综合久久综合中文88| 亚洲中文字幕无码中字| 麻豆精品新a v视频中文字幕| 无码av最新无码av专区| 成在人线av无码免费漫画| 亚洲欧美日韩中文v在线| 亚洲中文字幕永久在线全国 | 欧美视频一区二区三区| 日产精品一区二区|