亚洲一级电影在线观看,九九精品无码专区免费,亚洲AV无码资源在线观看 ,欧美国产高清

大學英語閱讀理解題及答案

時間:2024-09-22 17:30:59 英語閱讀 我要投稿
  • 相關推薦

大學英語閱讀理解題及答案

  以下是由yjbys小編為大家提供的大學英語的閱讀理解題以及參考答案,歡迎要考六級的同學閱讀學習一下哦!

大學英語閱讀理解題及答案

  第一篇:

  In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular (標準件的) system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.

  There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.

  After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.

  After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.

  In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.

  1. The main difference between panel method and the method discussed in the last paragraph is_______.

  A. the latter uses ready-made internal features

  B. panels are cast in a level position

  C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms

  D. the former is more expensive than the latter

  2. Which of these statements is TRUE of system building?

  A. It employs more men. B. It is difficult and dangerous.

  C. It can save both time and money. D. It means less mechanization.

  3. According to the passage, the principle of system building is that_______.

  A. construction methods are safer

  B. buildings are made from a set of standardized units

  C. similar buildings can be produced

  D. all units are produced on the site

  4. The usual fixed length in the modular system is_______.

  A. twenty centimeters B. ten millimeters

  C. fifty centimeters D. ten centimeters

  5. What lifts the concrete panels onto the building?

  A. Cranes. B. Man-power.

  C. Pulleys. D. Hydraulic jacks.


【大學英語閱讀理解題及答案】相關文章:

高考英語閱讀理解題及答案03-07

英語閱讀理解題及答案初中03-06

小學英語閱讀理解題及答案03-06

英語閱讀理解題加答案03-08

英語閱讀理解題及答案高中03-06

大學四級英語閱讀理解題及答案03-06

初三英語閱讀答案理解題及答案01-17

大學英語閱讀理解題03-07

高二英語閱讀理解題及答案03-09

主站蜘蛛池模板: 88国产经典欧美一区二区三区| 日本一卡二卡四卡无卡乱码视频免费 | 国产成人亚洲精品色欲AV| 亚洲国产另类久久久精品黑人| 少妇粉嫩小泬喷水视频www| 国产乱人伦偷精品视频不卡| 国产女主播一区| 久久综合久久鬼色| 宅男午夜成年影视在线观看| 日本体内she精高潮| 免费无码va一区二区三区| 天天躁夜夜躁狠狠喷水| 成人动漫综合网| 国产综合久久亚洲综合| 国产精品女同一区二区| 国产老熟妇精品观看| 国产精品自在线拍亚洲另类| 国产婷婷丁香五月缴情成人网 | 国产福利一区二区麻豆| 亚洲va中文在线播放免费| 波多野结衣的av一区二区三区| 精品国产网站| 18禁成人黄网站免费观看| 欧美变态另类牲交zozo| 国产suv精品一区二区69| 久久久久99精品成人片欧美一区| 欧美午夜视频在线| 国产精品国产三级国产试看| 国产女女精品视频久热视频 | 色综合久久精品中文字幕| 天天爱天天做天天爽| 久久996re热这里只有精品无码| 成在人线无码aⅴ免费视频| 国产欧美国日产高清| 无码h片在线观看网站| 国产v视频在线亚洲视频| 亚洲色欲www综合网| 国产极品久久久久极品| 欧美日韩精品一区二区在线视频| 人妻久久久一区二区三区| 中文字幕AV在线|